Files
wms-app/sdlc/1-PM Process (10 Work Product)/8.Software Configuration/200-WMS-26-001-00 Software Configuration 25690817 V1.0.md
T

100 lines
5.3 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Software Configuration
| Document field | Value |
|---|---|
| Document | Software Configuration |
| Project | BRN WMS |
| Project code | 200-WMS-26-001-00 |
| Title | Record of Software and Project Document Configuration and Version Control |
| Project period | 05/01/26–24/08/26 |
| Release | 17/08/26 V1.0 |
| Closure status date | 24/08/26 |
| Standard | ISO/IEC 29110 Basic Profile |
| Project Manager | Apirach Supattaratpateep |
| System Analyst | Noppong Chareunsook |
| Developer | Thanakorn Sathitwitayakul |
| Project Sponsor / Customer Representative | Seri Viriyasakultorn |
| Status | Final |
## 1. Purpose
This record identifies the controlled documents and software components that make up the BRN WMS configuration baseline and their version-control mechanism.
## 2. Controlled work products
| No. | Work product | Version | Status |
|---:|---|---|---|
| WP1 | Statement of Work | V1.0 Final | Complete |
| WP2 | Project Plan (Work Schedule, Software Project Plan, Customer Requirements) | V1.0 Final | Complete |
| WP3 | Progress Status Records (13 task-based records) | V1.0 | Complete |
| WP4 | Correction Register | V1.0 | Complete; 28 of 28 verified against linked test cases and formally closed through the Accepted decision |
| WP5 | Acceptance Report | V1.0 | Complete; decision Accepted and authorization recorded |
| WP6 | Change Report (3 separate reports: CH-001–CH-003) | V1.0 each | Complete |
| WP7 | Meeting Record (4 checkpoint records: MTG-001–MTG-004) | V1.0 each | Complete |
| WP8 | Software Configuration | V1.0 | This document |
| WP9 | Project Repository | V1.0 | Complete |
| WP10 | Project Repository (Backup) | V1.0 | Complete; BK-001–BK-004 closed, including final SDLC branch/tag synchronization and retrieval verification |
| WP11 | Software Requirements Specification (SRS) | V1.0 | Complete |
| WP12 | Software Design | V1.0 | Complete |
| WP13 | Traceability Record | V1.0 | Complete; 34/34 requirements linked and verified |
| WP14 | Software Components | V1.0 | Complete |
| WP15 | Test Cases and Test Procedures | V1.0 | Complete; 34 cases defined, 34 executed 10/08/26–14/08/26 |
| WP16 | Test Report | V1.0 | Complete; 34 of 34 executed and passed 10/08/26–14/08/26 |
| WP17 | Software | V1.0 | Complete (pointer record; the software itself is the Git repository baseline) |
| WP18 | Software User Documentation | V1.0 | Complete |
| WP19 | Product Operation Guide | V1.0 | Complete |
| WP20 | Maintenance Documentation | V1.0 | Complete |
| WP21 | Verification Results | V1.0 | Complete; Round 2 independent verification by Document Control 17/08/26 |
| WP22 | Validation Result | V1.0 | Complete; 12 of 12 scenarios executed and passed 10/08/26–14/08/26 |
| Other Document | List of Evidence, Stakeholder Register, Project Charter Report, Traceability Record Table, Training Report | V1.0 | Complete; training delivered to 6 attendees on 22/08/26 with successful workflow walkthrough |
## 3. Software baseline (configuration items)
| Item | Location | Version-control reference | Control mechanism |
|---|---|---|---|
| Application source (PHP) | `app/` | Git baseline `6c39700` | Git; software baseline on `main` |
| Node.js services (notifications, scheduler) | `nodejs/` | Git baseline `6c39700`; `package.json`/`package-lock.json` | Git; software baseline on `main` |
| Database setup/schema | `setup.php`, `docker/mariadb/init-wms2.sql` | Git baseline `6c39700` | Git; software baseline on `main` |
| Deployment configuration | `docker-compose.yml`, `docker/`, `.env.example` | Git baseline `6c39700` | Git; software baseline on `main`; secrets excluded |
| Environment secrets (`.env`, `app/config.php`) | Deployment host only | Not version-controlled | Generated at deploy time via `docker/init-env.sh`; excluded by `.gitignore` |
| SDLC work products | `sdlc/` | Git-tracked `.md` | Git; documentation delivery branch `sdlc` |
| SDLC delivery package | `sdlc-delivery/` | Generated from `sdlc/`, not hand-edited | Git; documentation delivery branch `sdlc`; generated by `scripts/build-sdlc-delivery.sh` |
## 4. Version control and access
| Field | Value |
|---|---|
| Repository | This Git repository; delivered software baseline `6c39700` on `main`, with SDLC sources and generated delivery package controlled on the `sdlc` documentation delivery branch |
| Primary remote (`origin`) | `git@188.166.228.62:nok/wms-app.git` |
| Backup remote (`backup`) | `git@github.com:thanakorninbox-dev/wms-app.git` |
| Access control | SSH key-based Git authentication (per configured remotes); no separate access-control record produced |
## 5. Change linkage
Configuration-item changes are controlled through the Change Report and Correction Register.
## 6. Approval
### Prepared by
Name: Thanakorn Sathitwitayakul
Role: Developer
Signature: ______________________________________________
Date: ___________________________________________________
### Reviewed by
Name: Apirach Supattaratpateep
Role: Project Manager
Signature: ______________________________________________
Date: ___________________________________________________
### Approved by
Name: Seri Viriyasakultorn
Project roles: Project Sponsor / Customer Representative / Authorized Approver
Position: Managing Director
Company: B.R.N. Enterprise Co., Ltd.
Signature: ______________________________________________
Date: ___________________________________________________