List of Evidence

Document field Value
Document List of Evidence
Project BRN WMS
Project code 200-WMS-26-001-00
Title Record of Verification of Project Document Preparation and Storage Status
Project period 05/01/26–24/08/26
Release 17/08/26 V1.0
Standard ISO/IEC 29110 Basic Profile
Organizer Apirach Supattaratpateep (Project Manager), Noppong Chareunsook (System Analyst), Thanakorn Sathitwitayakul (Developer)
Status Final — reflects the document inventory at project baseline

Objective

Index every controlled work product prepared for BRN WMS, its file, and its current preparation status, so completeness can be checked at a glance without opening each folder.

PM Process

No. Work product File(s) Status
1 Statement of Work 200-WMS-26-001-00 Statement of Work 25690105 V1.0 Final.md Complete (Markdown, HTML, PDF)
2 Project Plan — Work Schedule 200-WMS-26-001-00 Work Schedule 25690817 V1.1 Final.md Complete (V1.1 re-issue; V1.0 dated 25690105 superseded)
2 Project Plan — Software Project Plan 200-WMS-26-001-00 Software Project Plan 25690817 V1.1 Final.md Complete (V1.1 re-issue; V1.0 dated 25690105 superseded)
2 Project Plan — Customer Requirements 200-WMS-26-001-00 Customer Requirements 25690112 V1.0 Final.md Complete
3 Progress Status Record (13 records) ...25690123, 25690218, 25690225, 25690317, 25690429, 25690508, 25690513, 25690523, 25690529, 25690731, 25690803, 25690814, 25690817 V1.0.md Complete (all 13)
4 Correction Register 200-WMS-26-001-00 Correction Register 25690817 V1.0.md Complete; 28 entries, all verified against linked test cases
5 Acceptance Report 200-WMS-26-001-00 Acceptance Report 25690817 V1.0.md Complete; decision Accepted; CON-009 (signature capture) open
6 Change Report (3 separate reports) ... - Rack to Bin Rename 25690521, - Demo Data Population 25690808, - Delivery Preparation Bundle 25690810 Complete (CH-001–CH-003)
7 Meeting Record (4 checkpoint records) ... - Project Initiation Checkpoint 25690213, - Development Substantially Complete Checkpoint 25690529, - Stabilization Checkpoint 25690803, - Closure Preparation Checkpoint 25690814 Complete (MTG-001–MTG-004)
8 Software Configuration 200-WMS-26-001-00 Software Configuration 25690817 V1.0.md Complete
9 Project Repository 200-WMS-26-001-00 Project Repository 25690817 V1.0.md Complete
10 Project Repository (Backup) 200-WMS-26-001-00 Project Repository (Backup) 25690817 V1.0.md Complete; restoration check performed

SI Process

No. Work product File Status
11 Software Requirements Specification (SRS) 200-WMS-26-001-00 Software Requirements Specification 25690817 V1.0.md Complete
12 Software Design 200-WMS-26-001-00 Software Design 25690817 V1.0.md Complete
13 Traceability Record 200-WMS-26-001-00 Traceability Record 25690817 V1.0.md Complete; 34/34 requirements linked and verified
14 Software Components 200-WMS-26-001-00 Software Components 25690817 V1.0.md Complete
15 Test Cases and Test Procedures 200-WMS-26-001-00 Test Cases and Test Procedures 25690817 V1.0.md Complete; 34 cases defined, 34 executed 10/08/26–14/08/26
16 Test Report 200-WMS-26-001-00 Test Report 25690817 V1.0.md Complete; 34 of 34 passed
17 Software 200-WMS-26-001-00 Software 25690817 V1.0.md Markdown complete (pointer record); the software itself is delivered via the Git repository
18 Software User Documentation 200-WMS-26-001-00 Software User Documentation 25690817 V1.0.md Complete
19 Product Operation Guide 200-WMS-26-001-00 Product Operation Guide 25690817 V1.0.md Complete
20 Maintenance Documentation 200-WMS-26-001-00 Maintenance Documentation 25690817 V1.0.md Complete
21 Verification Results 200-WMS-26-001-00 Verification Results 25690817 V1.0.md Complete; Round 2 independent verification by Document Control 17/08/26
22 Validation Result 200-WMS-26-001-00 Validation Result 25690817 V1.0.md Complete; 12 of 12 scenarios passed

Other Document

No. Item File Status
1 List of Evidence This document Complete
2 Stakeholder Register 200-WMS-26-001-00 Stakeholder Register 25690817 V1.0.md Complete
3 Project Charter Report 200-WMS-26-001-00 Project Charter Report 25690817 V1.0.md Complete
4 Traceability Record Table 200-WMS-26-001-00 Traceability Record Table 25690817 V1.0.md Complete as a pointer/summary to work product 13 (single master matrix; see that document for the deviation rationale)
5 Training Report 200-WMS-26-001-00 Training Report 25690817 V1.0.md Not yet conducted; planned curriculum only

Summary

Measure Count
Total controlled work-product entries (PM + SI, counting each grouped item as one row above) 22
Total individual controlled files (13 Progress Status Records + 3 Change Reports + 4 Meeting Records + 26 single-instance documents) 46
Markdown source complete under sdlc/ 46 of 46
Included in the generated PDF delivery package (sdlc-delivery/) 42 of 46 — regeneration pending for the 4 Meeting Records
Other Document items complete 4 of 5 (Training Report pending execution, not preparation)

The PDF delivery package is generated from sdlc/ by scripts/build-sdlc-delivery.sh; it is build output and is not edited by hand.

Approval

Prepared by

Name: Thanakorn Sathitwitayakul
Role: Developer Signature: ______________________________________________
Date: ___________________________________________________

Reviewed by

Name: Apirach Supattaratpateep
Role: Project Manager
Signature: ______________________________________________
Date: ___________________________________________________

Reviewed and authorized by

Name: Seri Viriyasakultorn
Project roles: Project Sponsor / Customer Representative / Authorized Approver
Position: Managing Director
Company: B.R.N. Enterprise Co., Ltd.
Signature: ______________________________________________
Date: ___________________________________________________