Thanakorn de6ff85fa1 docs(sdlc): address 23/09 review feedback
Trace every CR to a test case or delivered document, drop the draft FR/NFR remark column, record lessons learned, replace the three change reports with a change-control register, add high-level diagrams and wireframes to the design, plan verification rounds with dates and hours, and base the validation result on the Customer Requirements.