Verification Results

Document field Value
Document Verification Results
Project BRN WMS
Project code 200-WMS-26-001-00
Title Record of Verification Against Standard Requirements
Project period 05/01/26–24/08/26
Release 17/08/26 V1.0
Standard ISO/IEC 29110 Basic Profile
Review round Round 2 completed — independent verification confirmed by the project user on 17/08/26
Organizer Apirach Supattaratpateep (Project Manager), Noppong Chareunsook (System Analyst), Thanakorn Sathitwitayakul (Developer)
Status Final — independent verification and review completion confirmed by the project user

Objective

Confirm the correctness and completeness of the SDLC work products delivered so far, against ISO/IEC 29110 Basic Profile document-control expectations, before they are treated as ready for Project Sponsor review.

1. Deliverables under review

PM work products 1–10 and SI work products 11–20 (this and work product 22 are excluded from self-review, being the verification/validation records themselves).

2. Verification items

Each row checks the document-control header, content, project coverage, and approval block.

ID Work product Header complete Purpose met Evidence basis disclosed Approval block present Result
VR-01 Statement of Work Yes Yes N/A Yes Passed
VR-02 Project Plan (Work Schedule, SPP, Customer Requirements) Yes Yes Yes, where Yes Passed
VR-03 Progress Status Records (13) Yes Yes Yes Yes Passed
VR-04 Correction Register Yes Yes Yes Yes Passed
VR-05 Acceptance Report Yes Yes Yes Yes Passed
VR-06 Change Report (CH-001–CH-003) Yes Yes Yes Yes Passed
VR-08 Software Configuration Yes Yes Yes Yes Passed
VR-09 Project Repository Yes Yes Yes Yes Passed
VR-10 Project Repository (Backup) Yes Yes Yes — backup sync marked as developer-reported, not independently verified Yes Passed
VR-11 Software Requirements Specification Yes Yes Yes — scaling note explains granularity choice Yes Passed
VR-12 Software Design Yes Yes Yes Yes Passed
VR-13 Traceability Record Yes Yes Yes Yes Passed
VR-14 Software Components Yes Yes Yes Yes Passed
VR-15 Test Cases and Test Procedures Yes Yes Yes — all 34 cases recorded as passed on execution Yes Passed
VR-16 Test Report Yes Yes Yes — records 34 of 34 passed on execution Yes Passed
VR-17 Software Yes Yes Yes Yes Passed
VR-18 Software User Documentation Yes Yes N/A (forward-facing usage guide) Yes Passed
VR-19 Product Operation Guide Yes Yes Yes Yes Passed
VR-20 Maintenance Documentation Yes Yes Yes Yes Passed

3. Risk and constraint note

  1. Round 1 was a self-review by the document preparer. The project user confirmed that an independent Round 2 verification was completed on 17/08/26; the individual reviewer and detailed review record were not separately recorded.
  2. Test execution, verification, and validation facilitation (work products 15, 16, 22) are now assigned to Parin Ngamkham, QA / Tester, independent of the Developer who prepared this record — added to the project 17/08/26. This mitigates the self-testing concern for those three work products specifically. A Document Control role (Yaowalak Bangchomphoo) was also added 17/08/26, but has not yet performed any independent document review — Round 1 of this record (this record and work products 1–14, 17–21) remains a self-review by the Developer who authored them. Whether Document Control's role should include reviewing this document set going forward is a scope decision for the user, not assumed here.
  3. All 34 functional/non-functional test cases and all 12 UAT/validation scenarios completed and passed.
  4. Future reviews should retain the named independent reviewer and approval record.

4. Recommendation

Retain the recorded confirmation and capture named reviewer/signature evidence in future projects.

5. Approval

Prepared by

Name: Thanakorn Sathitwitayakul
Role: Developer Signature: ______________________________________________
Date: ___________________________________________________

Reviewed by

Name: Apirach Supattaratpateep
Role: Project Manager
Signature: ______________________________________________
Date: ___________________________________________________

Reviewed and authorized by

Name: Seri Viriyasakultorn
Project roles: Project Sponsor / Customer Representative / Authorized Approver
Position: Managing Director
Company: B.R.N. Enterprise Co., Ltd.
Signature: ______________________________________________
Date: ___________________________________________________