List of Evidence

Document field Value
Document List of Evidence
Project BRN WMS
Project code 200-WMS-26-001-00
Title บันทึกผลการตรวจสอบสถานะการจัดเตรียมและการจัดเก็บเอกสารของโครงการ
Project period 05/01/26–24/08/26
Preparation date 17/08/26
Release 17/08/26 V1.0
Standard ISO/IEC 29110 Basic Profile
Organizer คุณอภิรัชต์ สุภัทรประทีป (Project Manager), ธนกร สถิตวิทยากุล (Developer / System Analyst)
Status Final — reflects the document inventory at report preparation

Current status as of 17/08/26: The planned/agreed project period (05/01/26–14/08/26) has ended. The project is past its planned closure date with independent verification, test execution, customer validation, and the Project Sponsor's acceptance signature still outstanding — see the Acceptance Report (work product 5) for the authoritative status and itemized conditions.

Objective (วัตถุประสงค์)

Index every controlled work product prepared for BRN WMS, its file, and its current preparation status, so completeness can be checked at a glance without opening each folder.

PM Process

No. Work product File(s) Status
1 Statement of Work 200-WMS-26-001-00 Statement of Work 25690105 V1.0 Final.md/.html/.pdf Complete (Markdown, HTML, PDF)
2 Project Plan — Work Schedule 200-WMS-26-001-00 Work Schedule 25690105 V1.0 Final.md/.html/.pdf Complete
2 Project Plan — Software Project Plan 200-WMS-26-001-00 Software Project Plan 25690105 V1.0 Final.md/.html/.pdf Complete
2 Project Plan — Customer Requirements 200-WMS-26-001-00 Customer Requirements 25690112 V1.0 Final.md/.html/.pdf Complete
3 Progress Status Record (13 records) ...25690123, 25690218, 25690225, 25690317, 25690429, 25690508, 25690513, 25690523, 25690529, 25690731, 25690803, 25690814, 25690817 V1.0.md/.html/.pdf Complete (all 13)
4 Correction Register 200-WMS-26-001-00 Correction Register 25690817 V1.0.md/.html/.pdf Complete; 29 entries, verification pending per entry
5 Acceptance Report 200-WMS-26-001-00 Acceptance Report 25690814 V1.0.md/.html/.pdf Complete; decision pending
6 Change Report (4 separate reports) ... - Rack to Bin Rename 25690527, - Demo Data Population 25690814, - Delivery Preparation Bundle (Rebranding + Docker Compose) 25690817, - Closure Extension 25690817 V1.0.md Markdown complete (CH-001–CH-004); HTML/PDF pending
7 Meeting Record (4 reconstructed checkpoints) ... - Project Initiation Checkpoint 25690219, - Development Substantially Complete Checkpoint 25690529, - Stabilization Checkpoint 25690803, - Completion Boundary Checkpoint 25690814 V1.0.md Markdown complete (MTG-001–MTG-004); no meeting is asserted to have occurred; HTML/PDF pending
8 Software Configuration 200-WMS-26-001-00 Software Configuration 25690817 V1.0.md Markdown complete; HTML/PDF pending
9 Project Repository 200-WMS-26-001-00 Project Repository 25690817 V1.0.md Markdown complete; HTML/PDF pending
10 Project Repository (Backup) 200-WMS-26-001-00 Project Repository (Backup) 25690817 V1.0.md Markdown complete; restoration check pending

SI Process

No. Work product File Status
11 Software Requirements Specification (SRS) 200-WMS-26-001-00 Software Requirements Specification 25690817 V1.0.md Markdown complete; HTML/PDF pending
12 Software Design 200-WMS-26-001-00 Software Design 25690817 V1.0.md Markdown complete; HTML/PDF pending
13 Traceability Record 200-WMS-26-001-00 Traceability Record 25690817 V1.0.md Markdown complete; 34/34 requirements linked, 0 verified
14 Software Components 200-WMS-26-001-00 Software Components 25690817 V1.0.md Markdown complete; HTML/PDF pending
15 Test Cases and Test Procedures 200-WMS-26-001-00 Test Cases and Test Procedures 25690817 V1.0.md Markdown complete; 34 cases defined, 0 executed
16 Test Report 200-WMS-26-001-00 Test Report 25690817 V1.0.md Markdown complete; 34 of 34 passed (user-confirmed)
17 Software 200-WMS-26-001-00 Software 25690817 V1.0.md Markdown complete (pointer record); the software itself is delivered via the Git repository
18 Software User Documentation 200-WMS-26-001-00 Software User Documentation 25690817 V1.0.md Markdown complete; HTML/PDF pending
19 Product Operation Guide 200-WMS-26-001-00 Product Operation Guide 25690817 V1.0.md Markdown complete; HTML/PDF pending
20 Maintenance Documentation 200-WMS-26-001-00 Maintenance Documentation 25690817 V1.0.md Markdown complete; HTML/PDF pending
21 Verification Results 200-WMS-26-001-00 Verification Results 25690817 V1.0.md Markdown complete; Round 1 self-review only
22 Validation Result 200-WMS-26-001-00 Validation Result 25690817 V1.0.md Markdown complete; 12 of 12 scenarios passed (user-confirmed)

Other Document

No. Item File Status
1 List of Evidence This document Complete
2 Stakeholder Register 200-WMS-26-001-00 Stakeholder Register 25690817 V1.0.md Complete
3 Project Charter Report 200-WMS-26-001-00 Project Charter Report 25690817 V1.0.md Complete; reconstructed retrospectively
4 Traceability Record Table 200-WMS-26-001-00 Traceability Record Table 25690817 V1.0.md Complete as a pointer/summary to work product 13 (single master matrix; see that document for the deviation rationale)
5 Training Report 200-WMS-26-001-00 Training Report 25690817 V1.0.md Not yet conducted; planned curriculum only

Summary

Measure Count
Total controlled work-product entries (PM + SI, counting each grouped item as one row above) 22
Total individual files across grouped items (13 PSR + 4 CR + 4 MTG counted individually, plus the other 30 singular items) 42
Complete with Markdown, HTML, and PDF 19 (PM work products 1–5 set)
Markdown complete, HTML/PDF pending 23 (PM 6–10, all SI 11–22)
Other Document items complete 4 of 5 (Training Report pending execution, not preparation)

Approval

Prepared by

Name: ธนกร สถิตวิทยากุล
Role: Developer / System Analyst
Signature: ______________________________________________
Date: ___________________________________________________

Reviewed by

Name: คุณอภิรัชต์ สุภัทรประทีป
Role: Project Manager
Signature: ______________________________________________
Date: ___________________________________________________

Reviewed and authorized by

Name: คุณเสรี วิริยะสกุลธรณ์
Project roles: Project Sponsor / Customer Representative / Authorized Approver
Position: กรรมการผู้จัดการ
Company: บริษัท บี.อาร์.เอ็น. เอ็นเตอร์ไพรส์ จำกัด
Signature: ______________________________________________
Date: ___________________________________________________