Verification Results

Document field Value
Document Verification Results
Project BRN WMS
Project code 200-WMS-26-001-00
Title บันทึกการตรวจสอบตามข้อกำหนดของมาตรฐาน
Project period 05/01/26–24/08/26
Preparation date 17/08/26
Release 17/08/26 V1.0
Standard ISO/IEC 29110 Basic Profile
Review round Round 2 completed — independent verification confirmed retrospectively by the project user on 17/08/26
Organizer คุณอภิรัชต์ สุภัทรประทีป (Project Manager), ธนกร สถิตวิทยากุล (Developer / System Analyst)
Status Final — independent verification and review completion confirmed retrospectively by the project user

Objective (วัตถุประสงค์)

Confirm the correctness and completeness of the SDLC work products delivered so far, against ISO/IEC 29110 Basic Profile document-control expectations, before they are treated as ready for Project Sponsor review.

1. Deliverables under review

PM work products 1–10 and SI work products 11–20 (this and work product 22 are excluded from self-review, being the verification/validation records themselves).

2. Verification items

Each row checks: (a) the document-control header table is present and complete, (b) the document's content matches its ISO 29110 purpose, (c) the evidence basis is disclosed where the content is reconstructed, (d) a three-tier approval block (Developer/PM/Sponsor, or equivalent) is present.

ID Work product Header complete Purpose met Evidence basis disclosed Approval block present Result
VR-01 Statement of Work Yes Yes N/A (contemporaneous) Yes Passed
VR-02 Project Plan (Work Schedule, SPP, Customer Requirements) Yes Yes Yes, where reconstructed Yes Passed
VR-03 Progress Status Records (13) Yes Yes Yes Yes Passed
VR-04 Correction Register Yes Yes Yes Yes Passed
VR-05 Acceptance Report Yes Yes Yes Yes Passed
VR-06 Change Report (CH-001–CH-004) Yes Yes Yes Yes Passed
VR-07 Meeting Record (MTG-001–MTG-004) Yes Yes Yes — explicitly discloses no meeting occurred Yes Passed
VR-08 Software Configuration Yes Yes Yes Yes Passed
VR-09 Project Repository Yes Yes Yes Yes Passed
VR-10 Project Repository (Backup) Yes Yes Yes — backup sync marked as developer-reported, not independently verified Yes Passed
VR-11 Software Requirements Specification Yes Yes Yes — scaling note explains granularity choice Yes Passed
VR-12 Software Design Yes Yes Yes Yes Passed
VR-13 Traceability Record Yes Yes Yes Yes Passed
VR-14 Software Components Yes Yes Yes Yes Passed
VR-15 Test Cases and Test Procedures Yes Yes Yes — all 34 cases recorded as passed on user-confirmed retrospective execution Yes Passed
VR-16 Test Report Yes Yes Yes — records 34 of 34 passed on user-confirmed retrospective execution Yes Passed
VR-17 Software Yes Yes Yes Yes Passed
VR-18 Software User Documentation Yes Yes N/A (forward-facing usage guide) Yes Passed
VR-19 Product Operation Guide Yes Yes Yes Yes Passed
VR-20 Maintenance Documentation Yes Yes Yes Yes Passed

3. Risk and constraint note

  1. Round 1 was a self-review by the document preparer. The project user confirmed that an independent Round 2 verification was completed retrospectively on 17/08/26; the individual reviewer and detailed review record were not separately recorded.
  2. Test execution, verification, and validation facilitation (work products 15, 16, 22) are now assigned to ปริญ งามขำ, QA / Tester, independent of the Developer / System Analyst who prepared this record — added to the project 17/08/26. This mitigates the self-testing concern for those three work products specifically. A Document Control role (คุณเยาวลักษณ์ บางชมภู) was also added 17/08/26, but has not yet performed any independent document review — Round 1 of this record (this record and work products 1–14, 17–21) remains a self-review by the Developer / System Analyst who authored them. Whether Document Control's role should include reviewing this document set going forward is a scope decision for the user, not assumed here.
  3. The project user also confirmed all 34 functional/non-functional test cases and all 12 UAT/validation scenarios completed and passed. These results are retrospective user-confirmed evidence, not inferred from Git history.
  4. Future reviews should retain the named independent reviewer and contemporaneous approval record.

4. Recommendation

Retain the recorded retrospective confirmation and capture named reviewer/signature evidence in future projects.

5. Approval

Prepared by

Name: ธนกร สถิตวิทยากุล
Role: Developer / System Analyst
Signature: ______________________________________________
Date: ___________________________________________________

Reviewed by

Name: คุณอภิรัชต์ สุภัทรประทีป
Role: Project Manager
Signature: ______________________________________________
Date: ___________________________________________________

Reviewed and authorized by

Name: คุณเสรี วิริยะสกุลธรณ์
Project roles: Project Sponsor / Customer Representative / Authorized Approver
Position: กรรมการผู้จัดการ
Company: บริษัท บี.อาร์.เอ็น. เอ็นเตอร์ไพรส์ จำกัด
Signature: ______________________________________________
Date: ___________________________________________________