Files
wms-app/sdlc/3-Other Document/200-WMS-26-001-00 Training Report 25690817 V1.0.md
T

3.5 KiB
Raw Blame History

Training Report

Document field Value
Document Training Report
Project BRN WMS
Project code 200-WMS-26-001-00
Title Training Report
Project period 05/01/26–24/08/26
Release 17/08/26 V1.0
Closure status date 24/08/26
Standard ISO/IEC 29110 Basic Profile
Prepared by Apirach Supattaratpateep — Project Manager
Status Final — training completed and results recorded

1. Training information

Topic Details
Training date 22/08/26
Location B.R.N. Enterprise Co., Ltd. head office, with remote attendance available for warehouse-floor staff
Trainer Thanakorn Sathitwitayakul (Developer), supported by Parin Ngamkham (QA / Tester) for workflow walkthroughs; no dedicated trainer role is assigned
Training organizer Apirach Supattaratpateep (Project Manager)
Attendance 6 attendees representing operational-user and system-administration roles; individual names were not separately retained
Actual duration One day, structured as the ten curriculum topics in Section 2
Materials Software User Documentation (work product 18) and Product Operation Guide (work product 19)

2. Curriculum delivered

Derived from the Software User Documentation (work product 18):

No. Topic
1 Accessing the system and role-based access overview
2 Dashboard orientation
3 Master data setup (warehouse, storage/bin, product, contact)
4 Inventory and warehouse operations (stock-in, stock-out, transfer, barcode)
5 Sales workflow (quotation → order → invoice → return)
6 Purchasing workflow (request → order → invoice → supplier return)
7 Finance and accounting (receipts, payments, journals, GL)
8 Document numbering and status lifecycle
9 Notifications
10 Reports (filter, view, print, export)

3. Result

Field Result
Actual date and duration 22/08/26; one day
Trainer and organizer Thanakorn Sathitwitayakul (Trainer), supported by Parin Ngamkham (QA / Tester); organized by Apirach Supattaratpateep (Project Manager)
Attendance 6 attendees
Evaluation All attendees completed the workflow walkthrough successfully.
Feedback None.
Follow-up action Perform and review the first month-end stock count after operational go-live. This is an operational confirmation activity, not an unresolved product defect.

4. Recommendation

Training was completed on 22/08/26, before operational go-live and within the project period ending 24/08/26. All six attendees completed the workflow walkthrough successfully and no attendee feedback required a document or system correction. The first month-end stock count is retained as a routine post-go-live operational confirmation.

5. Approval

Prepared by

Name: Apirach Supattaratpateep
Role: Project Manager
Signature: ______________________________________________
Date: ___________________________________________________

Reviewed by

Name: Thanakorn Sathitwitayakul
Role: Developer Signature: ______________________________________________
Date: ___________________________________________________

Reviewed and authorized by

Name: Seri Viriyasakultorn
Project roles: Project Sponsor / Customer Representative / Authorized Approver
Position: Managing Director
Company: B.R.N. Enterprise Co., Ltd.
Signature: ______________________________________________
Date: ___________________________________________________