Files
wms-app/sdlc/3-Other Document/200-WMS-26-001-00 Project Charter Report 25690817 V1.0.md
T

4.8 KiB
Raw Blame History

Project Charter Report

Document field Value
Document Project Charter Report
Project BRN WMS
Project code 200-WMS-26-001-00
Title Project Charter
Project period 05/01/26–24/08/26
Release 17/08/26 V1.0
Standard ISO/IEC 29110 Basic Profile
Prepared by Apirach Supattaratpateep — Project Manager
Status Final

Project information

No. Topic Details
1 Project name BRN WMS — Warehouse Management System Development Project
2 Project code 200-WMS-26-001-00
3 Start date 05/01/26 (formal project period start)
4 Project duration 05/01/26–24/08/26 (232 days)

Project objectives

Objective Description
Centralize warehouse management Replace manual/fragmented tracking with a single system for inventory accuracy, transaction control, and visibility
Support multi-company, multi-warehouse operation Restrict each user to authorized company and warehouse data
Integrate operational and financial workflows Connect sales, purchasing, and inventory movements to accounting and reporting
Strengthen control and auditability Controlled document numbering, status lifecycles, and traceable transaction history
Enable maintainable deployment Repeatable installation, configuration, and (per Product Operation Guide) backup/recovery procedures

Scope of Work (SOW)

No. System System name
1 User, Permission, and System Access Management System Identity, Role, and Application-Access Management
2 Master Data System (Warehouse, Product, Contact) Master Data Management (Warehouse, Product, Contact)
3 Warehouse and Stock Operations System Inventory and Warehouse Operations (stock in/out/transfer, lot/serial/expiry, barcode)
4 Sales System Sales (Quotation, Order, Invoice, Return, Credit Note)
5 Purchasing System Purchasing (Request, Order, Invoice, Supplier Return)
6 Finance System Finance (Receipt Billing/Receipts, Payment Billing/Payments)
7 Accounting System Accounting (Chart of Accounts, Departments, Journals, General Ledger)
8 Reporting System Reporting and Dashboards
9 Document Numbering and Status System Controlled Document Numbering and Lifecycle
10 Notification and Scheduled Task System Node.js/Socket.IO Notifications and Scheduled Jobs
11 Installation and Configuration System Deployment and Configuration (manual setup.php or Docker Compose)

This scope matches the delivered system scope already recorded in the Acceptance Report (work product 5), Section 2.

Key stakeholders

See the Stakeholder Register (this folder) for the full register with engagement levels. Summary:

No. Name Role Main responsibility
1 Seri Viriyasakultorn Project Sponsor Approve project documents and budget
2 Apirach Supattaratpateep Project Manager Manage the project plan and control quality
3 Noppong Chareunsook System Analyst Analyze requirements and define system behavior
4 Thanakorn Sathitwitayakul Developer Design and develop the system
5 Parin Ngamkham QA / Tester Test the system and verify quality
6 Yaowalak Bangchomphoo Document Control Control identifiers, versions, approvals, and evidence

Project timeline

Phase Period Notes
Initiation / planning 05/01/26–18/02/26 Project planning and preparation
Development 19/02/26–29/05/26 Application development
Stabilization 30/05/26–03/08/26 Stabilization evidence b2c4374 (03/08/26)
Test, validation and demonstration data 04/08/26–14/08/26 Test and validation execution 10/08/26–14/08/26; demo data population dd48a8b (14/08/26)
Delivery preparation 15/08/26–17/08/26 Rebranding, Docker Compose deployment stack, and SDLC documentation completion, and the recorded acceptance decision; see Change Report CH-003
Closure 18/08/26–24/08/26 Final work-product review and Project Sponsor signature capture; acceptance decision recorded 17/08/26

Project budget

Not separately tracked for this project.

Approval

Prepared by

Name: Apirach Supattaratpateep
Role: Project Manager
Signature: ______________________________________________
Date: ___________________________________________________

Reviewed by

Name: Thanakorn Sathitwitayakul
Role: Developer Signature: ______________________________________________
Date: ___________________________________________________

Reviewed and authorized by

Name: Seri Viriyasakultorn
Project roles: Project Sponsor / Customer Representative / Authorized Approver
Position: Managing Director
Company: B.R.N. Enterprise Co., Ltd.
Signature: ______________________________________________
Date: ___________________________________________________