Software Configuration

Document field Value
Document Software Configuration
Project BRN WMS
Project code 200-WMS-26-001-00
Title Record of Software and Project Document Configuration and Version Control
Project period 05/01/26–24/08/26
Release 17/08/26 V1.0
Standard ISO/IEC 29110 Basic Profile
Project Manager Apirach Supattaratpateep
System Analyst Noppong Chareunsook
Developer Thanakorn Sathitwitayakul
Project Sponsor / Customer Representative Seri Viriyasakultorn
Status Final

1. Purpose

This record identifies the controlled documents and software components that make up the BRN WMS configuration baseline and their version-control mechanism.

2. Controlled work products

No. Work product Version Status
WP1 Statement of Work V1.0 Final Complete
WP2 Project Plan (Work Schedule V1.1, Software Project Plan V1.1, Customer Requirements V1.0) V1.1 / V1.0 Final Complete; Work Schedule and Software Project Plan re-issued 17/08/26
WP3 Progress Status Records (13 task-based records) V1.0 Final Complete
WP4 Correction Register V1.0 Complete; 28 of 28 verified against linked test cases; formal closure awaits signature
WP5 Acceptance Report V1.0 Complete; decision Accepted; Sponsor signature capture outstanding
WP6 Change Report (3 separate reports: CH-001–CH-003) V1.0 each Complete
WP7 Meeting Record (4 checkpoint records: MTG-001–MTG-004) V1.0 each Complete
WP8 Software Configuration V1.0 This document
WP9 Project Repository V1.0 Complete
WP10 Project Repository (Backup) V1.0 Complete; restoration check performed
WP11 Software Requirements Specification (SRS) V1.0 Complete
WP12 Software Design V1.0 Complete
WP13 Traceability Record V1.0 Complete; 34/34 requirements linked and verified
WP14 Software Components V1.0 Complete
WP15 Test Cases and Test Procedures V1.0 Complete; 34 cases defined, 34 executed 10/08/26–14/08/26
WP16 Test Report V1.0 Complete; 34 of 34 executed and passed 10/08/26–14/08/26
WP17 Software V1.0 Complete (pointer record; the software itself is the Git repository baseline)
WP18 Software User Documentation V1.0 Complete
WP19 Product Operation Guide V1.0 Complete
WP20 Maintenance Documentation V1.0 Complete
WP21 Verification Results V1.0 Complete; Round 2 independent verification by Document Control 17/08/26
WP22 Validation Result V1.0 Complete; 12 of 12 scenarios executed and passed 10/08/26–14/08/26
Other Document List of Evidence, Stakeholder Register, Project Charter Report, Traceability Record Table, Training Report V1.0 each Complete; Training Report records that no training has occurred (planned curriculum only)

3. Software baseline (configuration items)

Item Location Version-control reference Control mechanism
Application source (PHP) app/ Git Git; branch main
Node.js services (notifications, scheduler) nodejs/ Git-tracked; package.json/package-lock.json Git; branch main
Database setup/schema setup.php, docker/mariadb/init-wms2.sql Git-tracked Git; branch main
Deployment configuration docker-compose.yml, docker/, .env.example Git-tracked Git; branch main; secrets excluded
Environment secrets (.env, app/config.php) Deployment host only Not version-controlled Generated at deploy time via docker/init-env.sh; excluded by .gitignore
SDLC work products sdlc/ Git-tracked .md Git; branch main
SDLC delivery package sdlc-delivery/ Generated from sdlc/, not hand-edited scripts/build-sdlc-delivery.sh

4. Version control and access

Field Value
Repository This Git repository (branch main)
Primary remote (origin) git@188.166.228.62:nok/wms-app.git
Backup remote (backup) git@github.com:thanakorninbox-dev/wms-app.git
Access control SSH key-based Git authentication (per configured remotes); no separate access-control record produced

5. Change linkage

Configuration-item changes are controlled through the Change Report and Correction Register.

6. Approval

Prepared by

Name: Thanakorn Sathitwitayakul
Role: Developer Signature: ______________________________________________
Date: ___________________________________________________

Reviewed by

Name: Apirach Supattaratpateep
Role: Project Manager
Signature: ______________________________________________
Date: ___________________________________________________

Approved by

Name: Seri Viriyasakultorn
Project roles: Project Sponsor / Customer Representative / Authorized Approver
Position: Managing Director
Company: B.R.N. Enterprise Co., Ltd.
Signature: ______________________________________________
Date: ___________________________________________________