Project Repository (Backup)

Document field Value
Document Project Repository (Backup)
Project BRN WMS
Project code 200-WMS-26-001-00
Title Project Repository Backup Record
Project period 05/01/26–24/08/26
Release 17/08/26 V1.0
Standard ISO/IEC 29110 Basic Profile
System Analyst Noppong Chareunsook
Developer Thanakorn Sathitwitayakul
Project Manager Apirach Supattaratpateep
Project Sponsor / Customer Representative Seri Viriyasakultorn
Status Final

1. Purpose

This record identifies the backup mechanisms protecting BRN WMS source code and SDLC work products against loss of the primary repository, per the Project Repository record (Section 2).

2. Code backup

Field Value
Backup mechanism Secondary Git remote
Backup remote name backup
Backup remote URL git@github.com:thanakorninbox-dev/wms-app.git
Configuration Secondary remote is configured for origin/main.
Sync status Maintained by the Developer; confirmed in sync with origin/main.
Restoration check Performed manually by the Developer and confirmed successful. Carried out outside version control, so no Git artefact records it.

3. Document backup

Field Value
Backup mechanism Exported PDF package, external to the Git repository
Location sdlc-delivery/ in the repository, generated from sdlc/ by scripts/build-sdlc-delivery.sh
Contents 42 PDFs covering the PM, SI, and Other Document work products; regeneration pending for the 4 Meeting Records
Verification Verified as non-empty and readable

4. Backup verification items

ID Item Owner Required before
BK-001 Confirm the backup remote is reachable and up to date with origin/main. Developer Closed — confirmed by the Developer
BK-002 Perform and record a restoration check (clone from backup and verify integrity). Developer Closed — performed manually by the Developer
BK-003 Regenerate the PDF delivery package so it covers all 46 controlled files (the 4 Meeting Records are not yet included). Developer Final delivery

5. Approval

Prepared by

Name: Thanakorn Sathitwitayakul
Role: Developer Signature: ______________________________________________
Date: ___________________________________________________

Reviewed by

Name: Apirach Supattaratpateep
Role: Project Manager
Signature: ______________________________________________
Date: ___________________________________________________

Reviewed and authorized by

Name: Seri Viriyasakultorn
Project roles: Project Sponsor / Customer Representative / Authorized Approver
Position: Managing Director
Company: B.R.N. Enterprise Co., Ltd.
Signature: ______________________________________________
Date: ___________________________________________________