Traceability Record Table

Document field Value
Document Traceability Record Table
Project BRN WMS
Project code 200-WMS-26-001-00
Title Traceability Matrix Summary Table
Project period 05/01/26–24/08/26
Release 17/08/26 V1.0
Standard ISO/IEC 29110 Basic Profile
Prepared by Thanakorn Sathitwitayakul — Developer
Status Final — pointer/summary; the controlled matrix lives in work product 13

Deviation from the example package

The example reference package keeps a full duplicate traceability matrix under 3-Other Document (TRACEABILITY-RECORD PDF + .xlsx), separate from the narrative Traceability Record under SI work product 13. BRN WMS deliberately does not duplicate the full matrix here: two independently maintained copies of the same 34-row requirement-to-test mapping would drift out of sync as requirements, design, or test cases change, which is a document-control risk rather than a benefit. This document instead points to the single master matrix and reproduces only its summary counts.

Master matrix location

The full CR/FR/NFR → SRS → Design Unit → Test Case matrix is maintained in:

sdlc/2-SI Process (12 Work Product)/13.Traceability record/200-WMS-26-001-00 Traceability Record 25690817 V1.0.md

Coverage summary (reproduced from work product 13, Section 4)

Measure Count
Total requirements (FR + NFR) 34
Linked to at least one SRS ID 34
Linked to at least one Design Unit ID 34
Linked to a defined Test Case ID 34
Test cases executed with recorded result 34
Verified in Verification Results (work product 21) 0
Validated in Validation Result (work product 22) 0

Approval

Prepared by

Name: Thanakorn Sathitwitayakul
Role: Developer Signature: ______________________________________________
Date: ___________________________________________________

Reviewed by

Name: Apirach Supattaratpateep
Role: Project Manager
Signature: ______________________________________________
Date: ___________________________________________________

Reviewed and authorized by

Name: Seri Viriyasakultorn
Project roles: Project Sponsor / Customer Representative / Authorized Approver
Position: Managing Director
Company: B.R.N. Enterprise Co., Ltd.
Signature: ______________________________________________
Date: ___________________________________________________