Files
wms-app/sdlc/ISO29110-audit-prep.md
T

2.6 KiB
Raw Blame History

BRN WMS (200-WMS-26-001-00) — ISO/IEC 29110 audit preparation

1. Questions auditors usually ask

Project Management (PM)

Usual question Where to point
What was agreed with the customer: scope, deliverables, acceptance criteria? Statement of Work, Software Project Plan §3
How did you plan: tasks, people, effort, schedule? Work Schedule, Software Project Plan §5–8
How did you track progress, and what did you do when something slipped? Progress Status Records (15 periods), Minutes of Meeting
What risks did you identify, and were they reviewed? Software Project Plan §9 (R1–R8); expect "show me a risk that changed during the project"
How were changes requested, assessed and approved? Change Report
How were defects recorded and closed? Correction Register ISS-001–028, each linked to a commit and a test case
How is the repository controlled and backed up? Project Repository, Project Repository (Backup), Software Configuration (main, baseline 6c39700)
Did the customer formally accept the product? Acceptance Report, Validation Results

Software Implementation (SI)

Usual question Where to point
Were requirements reviewed and baselined before development? Customer Requirements (CR01–CR14), SRS (SR01–SR09), requirements baseline 18 Feb 2569
Pick one requirement and show its design, code, test and result Traceability Record — most common test; rehearse 2–3 requirements end to end
Show the design and how it maps to the code Software Design (units UN01–UN13 with file paths)
Who reviewed which documents, what was found, and how was it fixed? Verification Results V0.1–V1.0 (4 rounds)
Show the test cases and test results, including a failure and its retest Test Case and Test Procedures (45), Test Report, Correction Register
What exactly was delivered, and can you rebuild it? Software, Software Components, Product Operation Guide
Are user, operation and maintenance documents available? Software User Document, Product Operation Guide, Maintenance Document

Weak points likely to be probed

Point How to prepare
No change requests in 8 months Explain why the evaluated items did not meet the change criteria
All 45 test cases passed in one run Point to the Correction Register: defects were found and fixed during development
Risks never re-rated Be ready to show where risks were reviewed in Progress Status Records
Interviews must match the documents Developer and QA rehearse: how a defect is logged; how TC-UN08.002 was run