# Traceability Record Table | Document field | Value | |---|---| | Document | Traceability Record Table | | Project | BRN WMS | | Project code | 200-WMS-26-001-00 | | Title | Traceability Matrix Summary Table | | Project period | 05/01/26–24/08/26 | | Release | 17/08/26 V1.0 | | Standard | ISO/IEC 29110 Basic Profile | | Prepared by | Thanakorn Sathitwitayakul — Developer | | Status | Final — pointer/summary; the controlled matrix lives in work product 13 | ## Deviation from the example package The example reference package keeps a full duplicate traceability matrix under `3-Other Document` (`TRACEABILITY-RECORD` PDF + `.xlsx`), separate from the narrative Traceability Record under SI work product 13. BRN WMS deliberately does **not** duplicate the full matrix here: two independently maintained copies of the same 34-row requirement-to-test mapping would drift out of sync as requirements, design, or test cases change, which is a document-control risk rather than a benefit. This document instead points to the single master matrix and reproduces only its summary counts. ## Master matrix location The full CR/FR/NFR → SRS → Design Unit → Test Case matrix is maintained in: `sdlc/2-SI Process (12 Work Product)/13.Traceability record/200-WMS-26-001-00 Traceability Record 25690817 V1.0.md` ## Coverage summary (reproduced from work product 13, Section 4) | Measure | Count | |---|---:| | Total requirements (FR + NFR) | 34 | | Linked to at least one SRS ID | 34 | | Linked to at least one Design Unit ID | 34 | | Linked to a defined Test Case ID | 34 | | Test cases executed with recorded result | 34 (executed 10/08/26–14/08/26) | | Verified in Verification Results (work product 21) | 34 | | Validated in Validation Result (work product 22) | 34 requirements covered by 12 passed scenarios | ## Approval ### Prepared by Name: Thanakorn Sathitwitayakul Role: Developer Signature: ______________________________________________ Date: ___________________________________________________ ### Reviewed by Name: Apirach Supattaratpateep Role: Project Manager Signature: ______________________________________________ Date: ___________________________________________________ ### Reviewed and authorized by Name: Seri Viriyasakultorn Project roles: Project Sponsor / Customer Representative / Authorized Approver Position: Managing Director Company: B.R.N. Enterprise Co., Ltd. Signature: ______________________________________________ Date: ___________________________________________________