# Software Configuration | Document field | Value | |---|---| | Document | Software Configuration | | Project | BRN WMS | | Project code | 200-WMS-26-001-00 | | Title | Record of Software and Project Document Configuration and Version Control | | Project period | 05/01/26–24/08/26 | | Release | 17/08/26 V1.0 | | Standard | ISO/IEC 29110 Basic Profile | | Project Manager | Apirach Supattaratpateep | | System Analyst | Noppong Chareunsook | | Developer | Thanakorn Sathitwitayakul | | Project Sponsor / Customer Representative | Seri Viriyasakultorn | | Status | Final | ## 1. Purpose This record identifies the controlled documents and software components that make up the BRN WMS configuration baseline and their version-control mechanism. ## 2. Controlled work products | No. | Work product | Version | Status | |---:|---|---|---| | WP1 | Statement of Work | V1.0 Final | Complete | | WP2 | Project Plan (Work Schedule, Software Project Plan, Customer Requirements) | V1.0 Final | Complete | | WP3 | Progress Status Records (13 task-based records) | V1.0 Final | Complete | | WP4 | Correction Register | V1.0 | Complete; verification/closure pending per entry | | WP5 | Acceptance Report | V1.0 | Complete; acceptance decision pending | | WP6 | Change Report (3 separate reports: CH-001–CH-003) | V1.0 each | Complete | | WP8 | Software Configuration | V1.0 | This document | | WP9 | Project Repository | V1.0 | Complete | | WP10 | Project Repository (Backup) | V1.0 | Complete; restoration check pending | | WP11 | Software Requirements Specification (SRS) | V1.0 | Complete | | WP12 | Software Design | V1.0 | Complete | | WP13 | Traceability Record | V1.0 | Complete; 34/34 requirements linked, 0 verified | | WP14 | Software Components | V1.0 | Complete | | WP15 | Test Cases and Test Procedures | V1.0 | Complete; 34 cases defined, 0 executed | | WP16 | Test Report | V1.0 | Complete as a status report; 34 of 34 passed | | WP17 | Software | V1.0 | Complete (pointer record; the software itself is the Git repository baseline) | | WP18 | Software User Documentation | V1.0 | Complete | | WP19 | Product Operation Guide | V1.0 | Complete | | WP20 | Maintenance Documentation | V1.0 | Complete | | WP21 | Verification Results | V1.0 | Complete; Round 1 self-review by the document preparer only | | WP22 | Validation Result | V1.0 | Complete as a status report; 12 of 12 scenarios passed | | Other Document | List of Evidence, Stakeholder Register, Project Charter Report, Traceability Record Table, Training Report | V1.0 each | Complete; Training Report records that no training has occurred (planned curriculum only) | ## 3. Software baseline (configuration items) | Item | Location | Version-control reference | Control mechanism | |---|---|---|---| | Application source (PHP) | `app/` | Git | Git; branch `main` | | Node.js services (notifications, scheduler) | `nodejs/` | Git-tracked; `package.json`/`package-lock.json` | Git; branch `main` | | Database setup/schema | `setup.php`, `docker/mariadb/init-wms2.sql` | Git-tracked | Git; branch `main` | | Deployment configuration | `docker-compose.yml`, `docker/`, `.env.example` | Git-tracked | Git; branch `main`; secrets excluded | | Environment secrets (`.env`, `app/config.php`) | Deployment host only | Not version-controlled | Generated at deploy time via `docker/init-env.sh`; excluded by `.gitignore` | | SDLC work products | `sdlc/` | Git-tracked `.md`/`.html`; PDFs exported externally | Git; PDF package at `C:\Users\TL\Documents\200-WMS-26-001-00\` | ## 4. Version control and access | Field | Value | |---|---| | Repository | This Git repository (branch `main`) | | Primary remote (`origin`) | `git@188.166.228.62:nok/wms-app.git` | | Backup remote (`backup`) | `git@github.com:thanakorninbox-dev/wms-app.git` | | Access control | SSH key-based Git authentication (per configured remotes); no separate access-control record produced | ## 5. Change linkage Configuration-item changes are controlled through the Change Report and Correction Register. ## 6. Approval ### Prepared by Name: Thanakorn Sathitwitayakul Role: Developer Signature: ______________________________________________ Date: ___________________________________________________ ### Reviewed by Name: Apirach Supattaratpateep Role: Project Manager Signature: ______________________________________________ Date: ___________________________________________________ ### Approved by Name: Seri Viriyasakultorn Project roles: Project Sponsor / Customer Representative / Authorized Approver Position: Managing Director Company: B.R.N. Enterprise Co., Ltd. Signature: ______________________________________________ Date: ___________________________________________________