SDLC docs alignment
This commit is contained in:
@@ -5,27 +5,22 @@
|
||||
| Document | Training Report |
|
||||
| Project | BRN WMS |
|
||||
| Project code | 200-WMS-26-001-00 |
|
||||
| Title | รายงานอบรม (Training Report) |
|
||||
| Title | Training Report |
|
||||
| Project period | 05/01/26–24/08/26 |
|
||||
| Preparation date | 17/08/26 |
|
||||
| Release | 17/08/26 V1.0 |
|
||||
| Standard | ISO/IEC 29110 Basic Profile |
|
||||
| Prepared by | คุณอภิรัชต์ สุภัทรประทีป — Project Manager |
|
||||
| Prepared by | Apirach Supattaratpateep — Project Manager |
|
||||
| Status | Final as a status report — **no training session has been conducted**; see Section 1 |
|
||||
|
||||
## 1. Disclosure
|
||||
## 1. Training information
|
||||
|
||||
At report preparation (17/08/26), no user-training session has taken place for BRN WMS. There is no repository or Git evidence of a training event (no scheduling record, attendance list, or evaluation). Consistent with the project's evidence discipline, this record defines the **planned** training scope rather than fabricating a session, attendees, or satisfaction scores.
|
||||
|
||||
## 2. Planned training information
|
||||
|
||||
| หัวข้อ | รายละเอียด |
|
||||
| Topic | Details |
|
||||
|---|---|
|
||||
| วันที่อบรม (Date) | Not yet scheduled |
|
||||
| สถานที่ (Location) | Not yet determined |
|
||||
| วิทยากรผู้สอน (Trainer) | ธนกร สถิตวิทยากุล (Developer / System Analyst); no dedicated trainer role is currently assigned |
|
||||
| ผู้จัดโครงการอบรม (Organizer) | คุณอภิรัชต์ สุภัทรประทีป (Project Manager) |
|
||||
| จำนวนผู้เข้าอบรม (Expected attendance) | Not yet determined — expected to include Owner/Admin, Staff, and Viewer role representatives per company |
|
||||
| Training date | Not yet scheduled |
|
||||
| Location | Not yet determined |
|
||||
| Trainer | Thanakorn Sathitwitayakul (Developer); no dedicated trainer role is currently assigned |
|
||||
| Training organizer | Apirach Supattaratpateep (Project Manager) |
|
||||
| Expected attendees | Not yet determined — expected to include Owner/Admin, Staff, and Viewer role representatives per company |
|
||||
|
||||
## 3. Planned curriculum
|
||||
|
||||
@@ -56,23 +51,23 @@ Schedule training after Test Report execution (work product 16) and before the c
|
||||
|
||||
### Prepared by
|
||||
|
||||
Name: คุณอภิรัชต์ สุภัทรประทีป
|
||||
Name: Apirach Supattaratpateep
|
||||
Role: Project Manager
|
||||
Signature: ______________________________________________
|
||||
Date: ___________________________________________________
|
||||
|
||||
### Reviewed by
|
||||
|
||||
Name: ธนกร สถิตวิทยากุล
|
||||
Role: Developer / System Analyst
|
||||
Name: Thanakorn Sathitwitayakul
|
||||
Role: Developer
|
||||
Signature: ______________________________________________
|
||||
Date: ___________________________________________________
|
||||
|
||||
### Reviewed and authorized by
|
||||
|
||||
Name: คุณเสรี วิริยะสกุลธรณ์
|
||||
Name: Seri Viriyasakultorn
|
||||
Project roles: Project Sponsor / Customer Representative / Authorized Approver
|
||||
Position: กรรมการผู้จัดการ
|
||||
Company: บริษัท บี.อาร์.เอ็น. เอ็นเตอร์ไพรส์ จำกัด
|
||||
Position: Managing Director
|
||||
Company: B.R.N. Enterprise Co., Ltd.
|
||||
Signature: ______________________________________________
|
||||
Date: ___________________________________________________
|
||||
|
||||