SDLC docs alignment

This commit is contained in:
Thanakorn
2026-08-18 12:37:28 +07:00
parent 37d2f8e725
commit a859cfda3e
48 changed files with 792 additions and 1446 deletions
@@ -5,27 +5,22 @@
| Document | Training Report |
| Project | BRN WMS |
| Project code | 200-WMS-26-001-00 |
| Title | รายงานอบรม (Training Report) |
| Title | Training Report |
| Project period | 05/01/26–24/08/26 |
| Preparation date | 17/08/26 |
| Release | 17/08/26 V1.0 |
| Standard | ISO/IEC 29110 Basic Profile |
| Prepared by | คุณอภิรัชต์ สุภัทรประทีป — Project Manager |
| Prepared by | Apirach Supattaratpateep — Project Manager |
| Status | Final as a status report — **no training session has been conducted**; see Section 1 |
## 1. Disclosure
## 1. Training information
At report preparation (17/08/26), no user-training session has taken place for BRN WMS. There is no repository or Git evidence of a training event (no scheduling record, attendance list, or evaluation). Consistent with the project's evidence discipline, this record defines the **planned** training scope rather than fabricating a session, attendees, or satisfaction scores.
## 2. Planned training information
| หัวข้อ | รายละเอียด |
| Topic | Details |
|---|---|
| วันที่อบรม (Date) | Not yet scheduled |
| สถานที่ (Location) | Not yet determined |
| วิทยากรผู้สอน (Trainer) | ธนกร สถิตวิทยากุล (Developer / System Analyst); no dedicated trainer role is currently assigned |
| ผู้จัดโครงการอบรม (Organizer) | คุณอภิรัชต์ สุภัทรประทีป (Project Manager) |
| จำนวนผู้เข้าอบรม (Expected attendance) | Not yet determined — expected to include Owner/Admin, Staff, and Viewer role representatives per company |
| Training date | Not yet scheduled |
| Location | Not yet determined |
| Trainer | Thanakorn Sathitwitayakul (Developer); no dedicated trainer role is currently assigned |
| Training organizer | Apirach Supattaratpateep (Project Manager) |
| Expected attendees | Not yet determined — expected to include Owner/Admin, Staff, and Viewer role representatives per company |
## 3. Planned curriculum
@@ -56,23 +51,23 @@ Schedule training after Test Report execution (work product 16) and before the c
### Prepared by
Name: คุณอภิรัชต์ สุภัทรประทีป
Name: Apirach Supattaratpateep
Role: Project Manager
Signature: ______________________________________________
Date: ___________________________________________________
### Reviewed by
Name: ธนกร สถิตวิทยากุล
Role: Developer / System Analyst
Name: Thanakorn Sathitwitayakul
Role: Developer
Signature: ______________________________________________
Date: ___________________________________________________
### Reviewed and authorized by
Name: คุณเสรี วิริยะสกุลธรณ์
Name: Seri Viriyasakultorn
Project roles: Project Sponsor / Customer Representative / Authorized Approver
Position: กรรมการผู้จัดการ
Company: บริษัท บี.อาร์.เอ็น. เอ็นเตอร์ไพรส์ จำกัด
Position: Managing Director
Company: B.R.N. Enterprise Co., Ltd.
Signature: ______________________________________________
Date: ___________________________________________________