@@ -10,19 +10,21 @@
| Release | 17/08/26 V1.0 |
| Standard | ISO/IEC 29110 Basic Profile |
| Prepared by | Apirach Supattaratpateep — Project Manager |
| Status | Final as a status report — **no training session has been conducted**; see Section 1 |
| Status | Final as a training plan — a session is **scheduled but not yet conducted**; see Section 1 |
## 1. Training information
| Topic | Details |
|---|---|
| Training date | Not yet scheduled |
| Location | Not yet determined |
| Trainer | Thanakorn Sathitwitayakul (Developer); no dedicated trainer role is currently assigned |
| Training date | Scheduled 21/08/26, within the project period ending 24/08/26; not yet conducted |
| Location | B.R.N. Enterprise Co., Ltd. head office, with remote attendance available for warehouse-floor staff |
| Trainer | Thanakorn Sathitwitayakul (Developer), supported by Parin Ngamkham (QA / Tester) for workflow walkthroughs; no dedicated trainer role is assigned |
| Training organizer | Apirach Supattaratpateep (Project Manager) |
| Expected attendees | Not yet determined — expected to include Owner/Admin, Staff, and Viewer role representatives per company |
| Expected attendees | Owner/Admin, Staff, and Viewer role representatives per company, plus the System Administrator |
| Planned duration | One day, structured as the ten curriculum topics in Section 2 |
| Materials | Software User Documentation (work product 18) and Product Operation Guide (work product 19) |
## 3. Planned curriculum
## 2. Planned curriculum
Derived from the Software User Documentation (work product 18):
@@ -39,15 +41,28 @@ Derived from the Software User Documentation (work product 18):
| 9 | Notifications |
| 10 | Reports (filter, view, print, export) |
## 4. Result
## 3. Result
No result to report — training has not yet occurred. This section will be completed with actual attendance, evaluation, and feedback once a session is held.
**No result to report — the session has not yet taken place.** This section is to be completed only after training is delivered, and must then record:
## 5. Recommendation
| Field | To be recorded after the session |
|---|---|
| Actual date and duration | |
| Trainer and organizer | |
| Attendance | Name, company, and role of each attendee |
| Evaluation | Comprehension check or post-training assessment result |
| Feedback | Attendee comments and any follow-up requests |
| Follow-up actions | Any documentation or system change arising from the session |
Schedule training after Test Report execution (work product 16) and before the customer validation session (work product 22), so trained users can meaningfully participate in validation walkthroughs.
Nothing in this section may be filled in before the session is delivered.
## 6. Approval
## 4. Recommendation
Test execution (work product 16) and customer validation (work product 22) were completed over 10/08/26–14/08/26 without a prior training session; validation was performed by the Customer Representative rather than by trained end users.
Training is therefore scheduled for 21/08/26, before operational go-live and within the project period ending 24/08/26, so that operational users are trained on the delivered system before they rely on it. Section 3 must be completed with actual attendance, evaluation, and feedback immediately after the session; until then this document stands as a plan and not as evidence that training has occurred.