| Project period | 05/01/26–24/08/26 |
|
||||
| Release | 17/08/26 V1.0 |
|
||||
| Standard | ISO/IEC 29110 Basic Profile |
|
||||
| Review round | Round 2 completed 17/08/26 — independent verification performed by Yaowalak Bangchomphoo, Document Control |
|
||||
| Review round | Round 2 completed 17/08/26 — Round 2A document-control verification and Round 2B technical work-product verification |
|
||||
| Organizer | Apirach Supattaratpateep (Project Manager), Noppong Chareunsook (System Analyst), Thanakorn Sathitwitayakul (Developer) |
|
||||
| Round 2 verifier | Yaowalak Bangchomphoo — Document Control, independent of the document preparer |
|
||||
| Status | Final — Round 2 independent verification complete |
|
||||
| Round 2A verifier | Yaowalak Bangchomphoo — Document Control, independent of the document preparer |
|
||||
| Round 2B technical reviewers | Noppong Chareunsook — System Analyst; Parin Ngamkham — QA / Tester; Apirach Supattaratpateep — Project Manager |
|
||||
| Status | Final — Round 2 document-control and technical verification complete |
|
||||
|
||||
## Objective
|
||||
|
||||
Confirm the correctness and completeness of the SDLC work products delivered so far, against ISO/IEC 29110 Basic Profile document-control expectations, before they are treated as ready for Project Sponsor review.
|
||||
Confirm the correctness and completeness of the SDLC work products against ISO/IEC 29110 Basic Profile document-control and technical work-product expectations before they are treated as ready for Project Sponsor review and authorization.
|
||||
|
||||
## 1. Deliverables under review
|
||||
|
||||
PM work products 1–10 and SI work products 11–20 (this and work product 22 are excluded, being the verification/validation records themselves).
|
||||
|
||||
## 2. Verification items
|
||||
## 2. Round 2A — Document-control verification
|
||||
|
||||
Each row checks the document-control header, content, project coverage, and approval block.
|
||||
|
||||
@@ -49,27 +50,62 @@ Each row checks the document-control header, content, project coverage, and appr
|
||||
| VR-19 | Product Operation Guide | Yes | Yes | Yes | Yes | Passed |
|
||||
| VR-20 | Maintenance Documentation | Yes | Yes | Yes | Yes | Passed |
|
||||
|
||||
## 3. Risk and constraint note
|
||||
## 3. Round 2B — Technical work-product verification
|
||||
|
||||
1. Round 1 was a self-review by the document preparer (the Developer). Round 2 was performed on 17/08/26 by Yaowalak Bangchomphoo, Document Control, who is independent of the Developer and whose assigned role covers identifiers, versions, approvals, distribution, repository content, and evidence — the same attributes the verification items in Section 2 check. Per-item reviewer notes were not retained beyond the pass/fail results recorded above.
|
||||
2. Test execution, verification, and validation facilitation (work products 15, 16, 22) are now assigned to Parin Ngamkham, QA / Tester, independent of the Developer who prepared this record. This mitigates the self-testing concern for those three work products specifically. Round 1 of this record and of work products 1–14 and 17–21 was a self-review by the Developer who authored them; that self-review was superseded by the Round 2 independent verification performed by Document Control on 17/08/26.
|
||||
| ID | Verification performed | Responsible reviewer | Result |
|
||||
|---|---|---|---|
|
||||
| TV-01 | Customer Requirements are complete, internally consistent, feasible within the agreed project scope, and expressed in a testable form. | Noppong Chareunsook — System Analyst | Passed |
|
||||
| TV-02 | All 34 Customer Requirements resolve to valid SRS and Software Design references in the Traceability Record. | Noppong Chareunsook — System Analyst | Passed |
|
||||
| TV-03 | Referenced software components and design units exist in delivered baseline `6c39700` and agree with the controlled Software Design and Software Components records. | Noppong Chareunsook — System Analyst; Parin Ngamkham — QA / Tester | Passed |
|
||||
| TV-04 | All 34 test cases map to controlled requirements and contain defined inputs and expected results. | Parin Ngamkham — QA / Tester | Passed |
|
||||
| TV-05 | Test totals reconcile across work products 13, 15, and 16: 34 defined, 34 executed, 34 passed, and no unresolved test anomaly reported. | Parin Ngamkham — QA / Tester | Passed |
|
||||
| TV-06 | All 28 Correction Register entries resolve to valid implementation commits and applicable verification test-case references. | Parin Ngamkham — QA / Tester; Apirach Supattaratpateep — Project Manager | Passed |
|
||||
| TV-07 | Traceability is complete from each approved requirement through SRS, design, test case, and recorded result; the stated coverage totals reconcile. | Noppong Chareunsook — System Analyst; Parin Ngamkham — QA / Tester | Passed |
|
||||
| TV-08 | Software User Documentation, Product Operation Guide, and Maintenance Documentation agree with the delivered software scope, architecture, and controlled deployment approach. | Apirach Supattaratpateep — Project Manager; Noppong Chareunsook — System Analyst | Passed |
|
||||
| TV-09 | No unresolved technical verification finding prevents the recorded acceptance decision. | Apirach Supattaratpateep — Project Manager | Passed |
|
||||
|
||||
## 4. Risk and constraint note
|
||||
|
||||
1. Round 1 was a self-review by the document preparer (the Developer). Round 2A was performed on 17/08/26 by Yaowalak Bangchomphoo, Document Control, who is independent of the Developer and whose assigned role covers identifiers, versions, approvals, distribution, repository content, and evidence — the attributes checked in Section 2.
|
||||
2. Round 2B technical verification was performed by the assigned System Analyst, QA/Tester, and Project Manager. Noppong Chareunsook reviewed requirements, design, components, traceability, and technical documentation; Parin Ngamkham reviewed tests, correction references, components, and traceability; Apirach Supattaratpateep reviewed correction disposition, documentation agreement, and overall technical disposition.
|
||||
3. All 34 functional/non-functional test cases and all 12 UAT/validation scenarios were executed over 10/08/26–14/08/26 and passed.
|
||||
4. Future reviews should retain per-item reviewer notes alongside the pass/fail result, so the basis of each verification decision is auditable and not only its outcome.
|
||||
4. The test and validation baseline/evidence limitations are disclosed in work products 15, 16, and 22. Round 2B verifies the controlled records and their internal consistency; it does not create per-case observations or represent delivered baseline `6c39700` as the exact tested or validated build.
|
||||
5. Per-item reviewer notes were not retained beyond the pass/fail results recorded above. Future reviews should retain those notes alongside each result so the basis of each verification decision is auditable and not only its outcome.
|
||||
|
||||
## 4. Recommendation
|
||||
## 5. Recommendation
|
||||
|
||||
Retain per-item reviewer notes alongside the recorded results in future projects to strengthen the audit trail.
|
||||
|
||||
## 5. Approval
|
||||
## 6. Reviewer declarations
|
||||
|
||||
### Prepared by (Round 2 independent verification)
|
||||
By signing the applicable blocks below, the assigned reviewers confirm that they performed the Round 2 checks attributed to their roles, found the referenced work products consistent with the controlled project evidence, recorded the listed checks as Passed, and identified no unresolved verification finding affecting acceptance.
|
||||
|
||||
The Document Control signature confirms Round 2A. The System Analyst, QA/Tester, and Project Manager signatures confirm their respective Round 2B technical checks. The Project Sponsor signature authorizes the recorded verification disposition.
|
||||
|
||||
## 7. Approval
|
||||
|
||||
### Round 2A verified by
|
||||
|
||||
Name: Yaowalak Bangchomphoo
|
||||
Role: Document Control
|
||||
Signature: ______________________________________________
|
||||
Date: ___________________________________________________
|
||||
|
||||
### Reviewed by
|
||||
### Round 2B requirements, design, components, traceability, and technical documentation verified by
|
||||
|
||||
Name: Noppong Chareunsook
|
||||
Role: System Analyst / Technical Reviewer
|
||||
Signature: ______________________________________________
|
||||
Date: ___________________________________________________
|
||||
|
||||
### Round 2B tests, corrections, components, and traceability verified by
|
||||
|
||||
Name: Parin Ngamkham
|
||||
Role: QA / Tester
|
||||
Signature: ______________________________________________
|
||||
Date: ___________________________________________________
|
||||
|
||||
### Round 2B reviewed and dispositioned by
|
||||
|
||||
Name: Apirach Supattaratpateep
|
||||
Role: Project Manager
|
||||
|
||||