# List of Evidence
| Document field | Value |
|---|---|
| Document | List of Evidence |
| Project | BRN WMS |
| Project code | 200-WMS-26-001-00 |
| Title | บันทึกผลการตรวจสอบสถานะการจัดเตรียมและการจัดเก็บเอกสารของโครงการ |
| Project period | 05/01/26–24/08/26 |
| Preparation date | 17/08/26 |
| Release | 17/08/26 V1.0 |
| Standard | ISO/IEC 29110 Basic Profile |
| Organizer | คุณอภิรัชต์ สุภัทรประทีป (Project Manager), ธนกร สถิตวิทยากุล (Developer / System Analyst) |
| Status | Final — reflects the document inventory at report preparation |
> **Current status as of 17/08/26:** The planned/agreed project period (05/01/26–14/08/26) has ended. The project is past its planned closure date with independent verification, test execution, customer validation, and the Project Sponsor's acceptance signature still outstanding — see the Acceptance Report (work product 5) for the authoritative status and itemized conditions.
## Objective (วัตถุประสงค์)
Index every controlled work product prepared for BRN WMS, its file, and its current preparation status, so completeness can be checked at a glance without opening each folder.
## PM Process
| No. | Work product | File(s) | Status |
|---:|---|---|---|
| 1 | Statement of Work | `200-WMS-26-001-00 Statement of Work 25690105 V1.0 Final.md/.html/.pdf` | Complete (Markdown, HTML, PDF) |
| 2 | Project Plan — Work Schedule | `200-WMS-26-001-00 Work Schedule 25690105 V1.0 Final.md/.html/.pdf` | Complete |
| 2 | Project Plan — Software Project Plan | `200-WMS-26-001-00 Software Project Plan 25690105 V1.0 Final.md/.html/.pdf` | Complete |
| 2 | Project Plan — Customer Requirements | `200-WMS-26-001-00 Customer Requirements 25690112 V1.0 Final.md/.html/.pdf` | Complete |
| 3 | Progress Status Record (13 records) | `...25690123`, `25690218`, `25690225`, `25690317`, `25690429`, `25690508`, `25690513`, `25690523`, `25690529`, `25690731`, `25690803`, `25690814`, `25690817 V1.0.md/.html/.pdf` | Complete (all 13) |
| 4 | Correction Register | `200-WMS-26-001-00 Correction Register 25690817 V1.0.md/.html/.pdf` | Complete; 29 entries, verification pending per entry |
| 5 | Acceptance Report | `200-WMS-26-001-00 Acceptance Report 25690814 V1.0.md/.html/.pdf` | Complete; decision pending |
| 6 | Change Report (4 separate reports) | `... - Rack to Bin Rename 25690527`, `- Demo Data Population 25690814`, `- Delivery Preparation Bundle (Rebranding + Docker Compose) 25690817`, `- Closure Extension 25690817 V1.0.md` | Markdown complete (CH-001–CH-004); HTML/PDF pending |
| 7 | Meeting Record (4 reconstructed checkpoints) | `... - Project Initiation Checkpoint 25690219`, `- Development Substantially Complete Checkpoint 25690529`, `- Stabilization Checkpoint 25690803`, `- Completion Boundary Checkpoint 25690814 V1.0.md` | Markdown complete (MTG-001–MTG-004); no meeting is asserted to have occurred; HTML/PDF pending |
| 8 | Software Configuration | `200-WMS-26-001-00 Software Configuration 25690817 V1.0.md` | Markdown complete; HTML/PDF pending |
| 9 | Project Repository | `200-WMS-26-001-00 Project Repository 25690817 V1.0.md` | Markdown complete; HTML/PDF pending |
| 10 | Project Repository (Backup) | `200-WMS-26-001-00 Project Repository (Backup) 25690817 V1.0.md` | Markdown complete; restoration check pending |
## SI Process
| No. | Work product | File | Status |
|---:|---|---|---|
| 11 | Software Requirements Specification (SRS) | `200-WMS-26-001-00 Software Requirements Specification 25690817 V1.0.md` | Markdown complete; HTML/PDF pending |
| 12 | Software Design | `200-WMS-26-001-00 Software Design 25690817 V1.0.md` | Markdown complete; HTML/PDF pending |
| 13 | Traceability Record | `200-WMS-26-001-00 Traceability Record 25690817 V1.0.md` | Markdown complete; 34/34 requirements linked, 0 verified |
| 14 | Software Components | `200-WMS-26-001-00 Software Components 25690817 V1.0.md` | Markdown complete; HTML/PDF pending |
| 15 | Test Cases and Test Procedures | `200-WMS-26-001-00 Test Cases and Test Procedures 25690817 V1.0.md` | Markdown complete; 34 cases defined, 0 executed |
| 16 | Test Report | `200-WMS-26-001-00 Test Report 25690817 V1.0.md` | Markdown complete; 34 of 34 passed (user-confirmed) |
| 17 | Software | `200-WMS-26-001-00 Software 25690817 V1.0.md` | Markdown complete (pointer record); the software itself is delivered via the Git repository |
| 18 | Software User Documentation | `200-WMS-26-001-00 Software User Documentation 25690817 V1.0.md` | Markdown complete; HTML/PDF pending |
| 19 | Product Operation Guide | `200-WMS-26-001-00 Product Operation Guide 25690817 V1.0.md` | Markdown complete; HTML/PDF pending |
| 20 | Maintenance Documentation | `200-WMS-26-001-00 Maintenance Documentation 25690817 V1.0.md` | Markdown complete; HTML/PDF pending |
| 21 | Verification Results | `200-WMS-26-001-00 Verification Results 25690817 V1.0.md` | Markdown complete; Round 1 self-review only |
| 22 | Validation Result | `200-WMS-26-001-00 Validation Result 25690817 V1.0.md` | Markdown complete; 12 of 12 scenarios passed (user-confirmed) |
## Other Document
| No. | Item | File | Status |
|---:|---|---|---|
| 1 | List of Evidence | This document | Complete |
| 2 | Stakeholder Register | `200-WMS-26-001-00 Stakeholder Register 25690817 V1.0.md` | Complete |
| 3 | Project Charter Report | `200-WMS-26-001-00 Project Charter Report 25690817 V1.0.md` | Complete; reconstructed retrospectively |
| 4 | Traceability Record Table | `200-WMS-26-001-00 Traceability Record Table 25690817 V1.0.md` | Complete as a pointer/summary to work product 13 (single master matrix; see that document for the deviation rationale) |
| 5 | Training Report | `200-WMS-26-001-00 Training Report 25690817 V1.0.md` | Not yet conducted; planned curriculum only |
## Summary
| Measure | Count |
|---|---:|
| Total controlled work-product entries (PM + SI, counting each grouped item as one row above) | 22 |
| Total individual files across grouped items (13 PSR + 4 CR + 4 MTG counted individually, plus the other 30 singular items) | 42 |
| Complete with Markdown, HTML, and PDF | 19 (PM work products 1–5 set) |
| Markdown complete, HTML/PDF pending | 23 (PM 6–10, all SI 11–22) |
| Other Document items complete | 4 of 5 (Training Report pending execution, not preparation) |
## Approval
### Prepared by
Name: ธนกร สถิตวิทยากุล
Role: Developer / System Analyst
Signature: ______________________________________________
Date: ___________________________________________________
### Reviewed by
Name: คุณอภิรัชต์ สุภัทรประทีป
Role: Project Manager
Signature: ______________________________________________
Date: ___________________________________________________
### Reviewed and authorized by
Name: คุณเสรี วิริยะสกุลธรณ์
Project roles: Project Sponsor / Customer Representative / Authorized Approver
Position: กรรมการผู้จัดการ
Company: บริษัท บี.อาร์.เอ็น. เอ็นเตอร์ไพรส์ จำกัด
Signature: ______________________________________________
Date: ___________________________________________________